Construction Site Compliance — Automated
LOLER inspections, plant certifications, method statement compliance, and site safety management. Built for site managers who can't afford HSE prohibition.
The compliance challenges construction sites face
HSE can close a site in minutes. Manual compliance tracking is too slow.
LOLER Deadline Tracking
Lifting equipment requires thorough examination every 6–12 months. A missed LOLER inspection can mean HSE prohibition and immediate work stoppage on site.
Plant Operator Competency Gaps
Every operator needs the right certification for each machine. Managing certifications manually across multiple sites and contractors is a constant audit risk.
Method Statement Compliance Chaos
Verifying that operatives have read and signed off method statements before starting work is often paper-based, incomplete, and impossible to audit quickly.
Safety Equipment Certification Lapses
Harnesses, gas monitors, fall arrest systems — all require regular inspection and certification. Equipment goes out of date without a systematic tracking system.
How AssetOS solves it
LOLER Inspections
- QR code access per equipment item
- Digital certificates with automatic renewal
- 60-day advance alerts
- HSE-compliant report generation
Plant Operator Competency
- Plant-specific competency matrix
- Automatic certification checking before use
- Training due alerts by operator
- CPCS/NPORS certificate tracking
Method Statement Compliance
- Digital sign-off workflow
- Site-specific RAMS requirements
- Automatic audit trail generation
- Instant compliance status reports
Safety Equipment Tracking
- Asset register per site
- Certification and testing schedules
- Inspection company integration
- HSE compliance report generation
Construction site compliance checklist
| Item | Frequency | Alert Lead Time |
|---|---|---|
| LOLER Inspections | 6–12 months | 60 days |
| Plant Operator Certification | 3–5 years | 90 days |
| Fall Arrest Equipment Testing | Every 6 months | 30 days |
| Crane Operator Competency | Every 5 years | 6 months |
| Method Statement Reviews | Per project | Before work starts |
| PPE Inspection | Every 6 months | 30 days |
| Gas Testing Calibration | Every 6 months | 30 days |
| First Aid Equipment | Monthly | 7 days |
Keep every site compliant
Start a free trial. LOLER, plant certs, method statements — all tracked automatically.
Start free trial